How do I create a VSM in PowerPoint?

How do I create a VSM in PowerPoint?

Create a value stream map

  1. Click File > New.
  2. Type value stream map in the Search box, click the Start Searching button, and then double-click Value Stream Map when it appears.
  3. From the Value Stream Map Shapes stencil, drag shapes onto the page to represent your processes, information, and materials.

What is value stream mapping template?

Production Control Value Stream Map This VSM template can be used to visualize the flow of materials and information within a product’s production path from the supplier to the customer.

What is value stream mapping PDF?

Value Stream Mapping involves process flows, communication flows and material flows from the point of raw material to the delivery of product to customer. This paper presents how value stream mapping can be used in manufacturing firms for improvement of overall production process.

What is value stream mapping Slideshare?

Value Stream Mapping Purpose Provide optimum value to the customer through a complete value creation process with minimum waste in: Design (concept to customer) Build (order to delivery) Sustain (in-use through life cycle to service)

How do I create a value stream?

How to draw a value stream map

  1. Determine the scope of your value stream map. Create your start and end points first, and place them in the top left and right corners of your document.
  2. Map the steps of your process.
  3. Add inventory and wait times.
  4. Designate the direction of information flows.
  5. Create a timeline.

How do you make a value stream map step by step?

What are the steps of Value Stream Mapping?

Value Stream Mapping in 7 Steps

  1. Document the current process.
  2. Identify and list every step in the process.
  3. Identify customer value.
  4. Define what the perfect process looks like.
  5. Identify those parts of the current process that get in the way of perfection.
  6. Identify major initiatives to reduce or eliminate waste.

How does VSM calculate process time?

Process efficiency In VSM, the ratio of process time (value adding time) to lead time. Calculated by dividing the total process time by total lead time. Also known as flow-time efficiency.

How does value stream mapping work?

Value stream mapping (VSM) is defined as a lean tool that employs a flowchart documenting every step in the process. Many lean practitioners see VSM as a fundamental tool to identify waste, reduce process cycle times, and implement process improvement.

How is value stream mapping done?

Begin typing your search term above and press enter to search. Press ESC to cancel.

Back To Top